Kelty to Cowdenbeath Active Travel Corridor

Stage status: Construction

Kelty and Cowdenbeath area are a little over 2km apart. This is an ideal distance for travel by active modes of transport such as cycling or walking. The two communities have many trip generators, such as:

  • schools
  • shops
  • transport links
  • community centres
  • leisure centres, and
  • outdoor spaces, including the nearby Lochore Meadows Country Park

In 2018, a feasibility study looked at the potential to develop an active travel corridor between Kelty and Cowdenbeath. More recently, preliminary design work has begun.

The limits of the project are from the Lochore Meadows access road in Kelty, to the Lochgelly Road roundabout in Cowdenbeath. This can be seen on the Location Plan. The route follows the A909, so it is easily accessed from many of Kelty’s residential roads. In Cowdenbeath, the route joins the Cowdenbeath to Lochgelly active travel corridor (B981). This is less than half a mile from the town centre. Other local paths are nearby.

The active travel corridor will comprise a new off-carriageway shared pedestrian cycle track. This replaces the existing on-road cycle lanes. The new track will be approximately 3.0m, wide with a buffer zone between the shared pedestrian/cycle track and the carriageway. At some locations, the track may narrow slightly due to local constraints. For most of the rural section, the track is on the east side of the road, but will cross to the west side in Cowdenbeath, via a new toucan crossing.

Phase 1

Substantially complete during 2023, 2km approx.

Phase 2:

Timeline: construction: on site during 2023 and early 2024

Distance: 600m approx.

Approximate infrastructure investment: £200,000

If you would like to request a copy of the pdf design drawings, or wish to comment on the project, please email: active.travel@fife.gov.uk

Phase 3:

Timeline: construction: on site during January 2024

Distance: 600m approx.

Approximate infrastructure investment: £120,000