Pittencrieff Park

graphic map of the park

Thanks to funding from the Heritage Lottery Fund, with match support from the Carnegie Dunfermline Trust and Fife Council, a £1.6 million transformation took place to return this much-loved green space to its former glory. A separate £1 million project to build a café extension on to the iconic Glen Pavilion, funded by the Carnegie Dunfermline Trust, was also completed at the same time.

The project masterplan

  1. Peacock Sanctuary and Picnic Area

    Refurbish former animal centre and develop as an indoor/ outdoor sanctuary for peacocks, refurbish adjacent toilets. Develop area south of the animal centre with wildflower meadow and picnic area.
  2. Glasshouses and Glassroom

    Extensively refurbish glasshouses, including a part conversion for use as a community learning facility. Improve surrounding access paths.
  3. Entrances and Gates Restoration

    Restore, paint and upgrade the Louise Carnegie, Abbey, Moodie Street, Nethertown, Coal Road and Pittencrieff Street entrances. Upgrade seating, litter bins and remove redundant features.
  4. Signage and Interpretation

    Design and install new signs and information panels (including maps at key entrances and locations), directional signs and fingerposts. Offer a suite of accompanying leaflets including history, natural history, links with coal, walks and built heritage.
  5. Lighting Improvements

    Improve park lighting throughout, in keeping with the heritage of the park; improve evening visits.
  6. Nethertown Sculptural Benches

    Replant shrub beds and commission 2 benches sculpted out of tree trunks.
  7. Glen Pavilion Stepped Arena Repairs

    Repair historic steps; replace old tarmac, step & kerb areas. Replant side areas & install picnic tables.
  8. Redundant Toilet Block Demolition

    Demolish derelict toilet block and reinstate area with planting to encourage biodiversity.
  9. Glen Pavilion Lawn.

    Install drainage across lawn, level surface and grass seed.
  10. Woodland Bulb Planting

    Plant new woodland bulbs.
  11. Events Lawn Improvements

    Improve drainage across lawn.
  12. Events Shelter Refurbishment

    Refurbish and convert shelter to provide storage area including removal of derelict toilets. Upgrade power supply to support events and landscape surrounding area.
  13. Redundant Paddling Pool Removal

    Remove redundant pool base and concrete surrounds. Level the site and create lawn area with seating around trees. Mark site of old well if found.
  14. Laird’s Garden Improvements

    Replace and restore rose beds, bedding, herbaceous borders, heather beds, box hedging and the Laird’s Walk. Develop new winter garden, herb garden and accessible demonstration kitchen garden. Refurbish entrance gates and fencing.
  15. Italian Garden Improvements

    Add signage and refurbish historic rails and chain.
  16. Lily Pond Improvements

    Improve pond, plant lilies and other aquatics. Improve garden by adding climbers.
  17. Telephone Kiosk Refurbishment

    Refurbish telephone kiosk and clean stonework.
  18. Sandstone Rock Garden Improvements

    Protection of key species and removal of overgrown plants. Prepare and replant with appropriate alpine and rock garden plants.
  19. Locomotive Restoration

    Refurbish locomotive and relocate within park.
  20. Lower Glen Improvements

    Open up key views to Abbey, new tree and understorey planting. Replace fencing and refurbish bridges. Upgrade path to south of Louise Carnegie gates to be DDA compliant and open up views to Abbey. Remove seedling trees and ivy to protect historic structure remains at the Heugh Mills and St Catherine’s Hospice – in progress.
  21. Wallace’s Well Improvements

    Carefully excavate to identify well, erect new protective steel cover, implement improvements to surrounding area and add information panel to site.
  22. Humpback Bridge Drainage Works

    General drainage improvements.
  23. Japanese Garden / Summer House Improvements

    Improvements to the landscape and replant with mix of herbaceous and shrubs to restore as Japanese Garden. Improve paths. Restore the summer house and surrounds.
  24. Andrew Carnegie Statue Refurbishment

    Clean and repair statue and plinth. Redesign and replant beds.
  25. Shrub Bed Improvements

    Selectively refurbish shrub beds and restore with supplementary and new planting to be welcoming and colourful but with reference to historic planting.
  26. Improvements by Malcolm Canmore’s Tower

    Restore and refurbish planted areas. Replace fencing and upgrade path sections. Restore important views to the Abbey, to the Tower Burn and across the Glen.
  27. Dovecot Refurbishment

    Refurbish dovecot and install heritage door.
  28. Stone Steps Improvements

    Restore formal set of steps and remove derelict steps.
  29. Double Bridge Railings Refurbishment

    Repair / replace / refurbish railing balustrades to the Double Tower Bridge.

Details

Location: Dunfermline

Value: £1,040,000

Start Date: July 2012

End Date: December 2015

Main Contractor: Various